Utilize este identificador para referenciar este registo: https://hdl.handle.net/1822/89549

Registo completo
Campo DCValorIdioma
dc.contributor.advisorMendonca, Joao Pedropor
dc.contributor.authorPlácido, Pedro Luís Pereirapor
dc.date.accessioned2024-03-14T18:18:31Z-
dc.date.available2024-03-14T18:18:31Z-
dc.date.issued2023-10-30-
dc.date.submitted2023-07-
dc.identifier.urihttps://hdl.handle.net/1822/89549-
dc.descriptionDissertação de mestrado integrado em Engenharia Mecânicapor
dc.description.abstractCom a crescente procura de inovar por parte dos arquitetos e com o aparecimento de novos sistemas de fachadas, caixilharia e revestimentos de edifícios, as soluções construtivas raramente são as mesmas num ambiente empresarial exigente. A empresa da Bysteel FS não é indiferente a este fenómeno. Como tal, a orçamentação destes sistemas é cada vez mais desafiante e requer uma constante atualização de informações com os fornecedores e com os departamentos incluídos no desenvolvimento de obras. O tema da presente dissertação insere-se nas necessidades da Bysteel FS de quantificação dos custos de mão-de-obra direta na fase de orçamentação. A elaboração dos orçamentos é feita no software Microsoft Excel. Por esta ser uma ferramenta comumente utilizada na empresa e por haver uma facilidade no manuseamento do pessoal do departamento de orçamentação, optou-se por explorar o mesmo. Desenvolveu-se uma ferramenta de cálculo de custos da mão-de-obra direta, onde se inclui os custos de maquinaria e montagem em fábrica e ainda os custos de instalação em obra. Para esta elaboração, tornou-se necessário compreender o funcionamento, montagem e fabrico dos vários sistemas transformados em fábrica, bem como os de instalação em obra. Este meio de cálculo possibilita a criação de uma base de dados coerente entre o departamento de orçamentação para uma homogeneidade dos cálculos dos tempos associados a cada sistema. Isto permite regrar e precisar os custos finais calculados. Além das funcionalidades referidas, permite a comunicação entre o departamento de orçamentação e os departamentos envolvidos na criação de uma obra, os de produção da fábrica e de direção de obra.por
dc.description.abstractWith the increasing demand for innovation by architects and the emergence of new façade, frame and cladding systems for buildings, the construction solutions are rarely the same in a demanding business environment. The Bysteel FS company is not indifferent to this phenomenon. As such, the budgeting of these systems is increasingly challenging and requires a constant update of information with suppliers and with the departments included in the development works. The subject of this dissertation falls within the needs of Bysteel FS for the quantification of labour costs in the budgeting phase. The budgets are drawn up using Microsoft Excel software. As this is a common communication resource in the company and because it is easy to use by the budgeting department staff, it was decided to explore it. There was developed a direct labour costing tool, which includes the costs of machinery and factory assembly, as well as on-site installation costs. For this preparation, it was necessary to understand the functioning, assembly and manufacture of the various systems transformed in the factory, as well as those of on-site installation. This means of calculation makes it possible to create a coherent database between the budgeting department for uniform calculations of the times associated with each system. This makes it possible to standardise and precise the final costs calculated. In addition to the functionalities, it enables communication between the estimating department and the departments involved in creating a job, such as factory production and site management.por
dc.language.isoporpor
dc.rightsopenAccesspor
dc.rights.urihttp://creativecommons.org/licenses/by/4.0/por
dc.subjectOrçamentaçãopor
dc.subjectFerramenta de cálculopor
dc.subjectCustospor
dc.subjectMão-de-obra diretapor
dc.subjectBudgetingpor
dc.subjectCalculation toolpor
dc.subjectCostspor
dc.subjectDirect labourpor
dc.titleDesenvolvimento de uma ferramenta de cálculo de custos da mão-de-obra direta imputáveis a uma obrapor
dc.typemasterThesiseng
dc.identifier.tid203539168por
thesis.degree.grantorUniversidade do Minhopor
sdum.degree.grade14 valorespor
sdum.uoeiEscola de Engenhariapor
dc.subject.fosEngenharia e Tecnologia::Engenharia Mecânicapor
Aparece nas coleções:BUM - Dissertações de Mestrado
DEM - Dissertações de Mestrado / MSc Thesis

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
Pedro Luis Pereira Placido.pdfDissertação de mestrado2,48 MBAdobe PDFVer/Abrir

Este trabalho está licenciado sob uma Licença Creative Commons Creative Commons

Partilhe no FacebookPartilhe no TwitterPartilhe no DeliciousPartilhe no LinkedInPartilhe no DiggAdicionar ao Google BookmarksPartilhe no MySpacePartilhe no Orkut
Exporte no formato BibTex mendeley Exporte no formato Endnote Adicione ao seu ORCID