Utilize este identificador para referenciar este registo:
https://hdl.handle.net/1822/77265
Título: | Aplicação de princípios e ferramentas Lean na rede de parceiros de uma unidade de automação de sistemas de energia |
Outro(s) título(s): | Application of Lean principles and tools in the network of partners of an automation of power systems' unit |
Autor(es): | Meira, Sara Raquel Ferreira Moura |
Orientador(es): | Moreira, Francisco |
Palavras-chave: | Lean production 5S Gestão visual Melhoria contínua Visual management Continuous improvement |
Data: | 2021 |
Resumo(s): | A presente dissertação está inserida no âmbito da conclusão do Mestrado Integrado em Engenharia e
Gestão Industrial, do Departamento de Produção e Sistemas da Universidade do Minho. O projeto foi
desenvolvido na empresa Jofalectric, um dos principais fornecedores em regime de outsourcing da rede
de parceiros da unidade de negócio de Automação de Sistemas de Energia da Efacec. Os objetivos
estabelecidos incidem na minimização de desperdícios detetados, redefinição do espaço fabril em termos
de organização e melhoria de processos através da aplicação de princípios e ferramentas Lean.
Adicionalmente foi definido o objetivo de obtenção de um valor mínimo de 60% na auditoria 5S a realizar
no final do projeto. Contudo, aquando da estipulação dos objetivos, foi reconhecido que era expectável
que os resultados obtidos fossem mais qualitativos do que quantitativos, devido ao cerne do projeto
residir sobretudo na instauração de ordem, método, organização e bases para uma melhoria contínua.
A metodologia de investigação utilizada foi a Action-Research, sendo que numa primeira fase foi realizada
uma revisão bibliográfica pertinente relativamente a Lean Production e a ferramentas associadas a este
conceito. Procedeu-se à realização de uma breve descrição da Efacec e da Jofalectric, bem como da
rede de parceiros e processos que os unem, seguida de uma análise crítica à situação atual da Jofalectric.
Nesta análise foram detetados problemas e recorreu-se a ferramentas de apoio à resolução destes, tais
como: diagrama de Ishikawa, diagrama de Spaghetti, brainstorming e 5W2H. Com o objetivo de colmatar
os problemas identificados, foram definidas propostas de melhoria, recorrendo à aplicação de princípios
e ferramentas Lean, que culminaram na definição de cinco grandes propostas: redefinição do layout
fabril, criação de um novo armazém de matéria-prima, aplicação dos 5S e gestão visual, criação de um
supermercado na zona de serralharia e criação de sistemas de incentivo ao envolvimento dos
colaboradores. A implementação destas propostas possibilitou o cumprimento dos objetivos estipulados,
tendo-se alcançado um espaço fabril limpo e organizado e reduzido desperdícios inerentes à falta de
organização. Atingiu-se um valor de 68% na auditoria final 5S realizada e constataram-se melhorias na
comunicação logística na rede de parceiros, melhorias processuais derivadas da atualização do layout,
um melhor armazenamento e controlo de inventário e um aumento no envolvimento dos colaboradores. The current dissertation project is inserted within the scope of the completion of the Integrated Master’s in Engineering and Industrial Management from the University of Minho’s Department of Production and Systems. The project was developed at Jofalectric, one of the main outsourcing suppliers of Efacec’s Automation of Power Systems’ network of partners. The main goals established for this project are based on the reduction of the detected waste, redefinition of the factory in terms of organization and process improvement through the application of Lean tools and principles. Additionally, a goal of attaining at least 60% in the final 5S Audit was also set. However, at the moment of the goals’ definition, it became clear that the project was expected to demonstrate more qualitative than quantitative results, due to the fact that the core of it lies mostly on the establishment of order, method, organization and a basis for continuous improvement. The investigation methodology used was Action-Research and, in the first phase of the project, a relevant bibliographic review about Lean Production and its tools was carried out. Following this step, a brief description of Efacec and Jofalectric proceeded, as well as of the network of partners and processes that link them, followed by a critical analysis of the current situation at Jofalectric. Through this analysis, several problems were identified and several tools in the framework of problem solving support were used, such as: Ishikawa diagram, Spaghetti diagram, brainstorming and 5W2H. Aiming the resolution of the detected problems, improvement proposals were formulated, resorting to the application of Lean tools and principles that culminated in the setting of five relevant proposals: layout redefinition, construction of a new raw material warehouse, 5S and visual management application, creation of a supermarket in the metalworking zone and promotion of incentive systems to the collaborators’ involvement. The implementation of these proposals enabled the achievement of the initially stipulated objectives, having achieved a clean and organized factory and reduced waste that was caused due to the lack of organization. A value of 68% in the final 5S Audit was attained and improvements in terms of logistic communication within the network of partners were achieved, as well as better stock control and storage and better involvement of collaborators. |
Tipo: | Dissertação de mestrado |
Descrição: | Dissertação de mestrado integrado em Engenharia e Gestão Industrial |
URI: | https://hdl.handle.net/1822/77265 |
Acesso: | Acesso aberto |
Aparece nas coleções: | BUM - Dissertações de Mestrado |
Ficheiros deste registo:
Ficheiro | Descrição | Tamanho | Formato | |
---|---|---|---|---|
SaraRFMMeira_A77008_Dissertação.pdf | 7,37 MB | Adobe PDF | Ver/Abrir |
Este trabalho está licenciado sob uma Licença Creative Commons