Utilize este identificador para referenciar este registo:
https://hdl.handle.net/1822/6894
Registo completo
Campo DC | Valor | Idioma |
---|---|---|
dc.contributor.author | Neves, Luís A. C. | - |
dc.contributor.author | Frangopol, Dan M. | - |
dc.contributor.author | Cruz, Paulo J. S. | - |
dc.date.accessioned | 2007-08-28 | - |
dc.date.available | 2007-08-28 | - |
dc.date.issued | 2006 | - |
dc.identifier.citation | CRUZ, Paulo J. S. ; FRANFOPOL, Dan M.; NEVES, Luís C., ed. lit.- “Bridge Mainetance, Safety, Management, Life-Cycle, Performance and Cost : proceedings of the International Conference on Bridge Maintenance, Safety and Management, 3, Porto, 2006” [S.l.] : Taylor & Francis, 2006. ISBN 978-0-415-40315-3. | eng |
dc.identifier.isbn | 0415403154 | por |
dc.identifier.uri | https://hdl.handle.net/1822/6894 | - |
dc.description.abstract | Due to the increase in deterioration of the existing civil infrastructure, in particular bridge networks, governments and highway agencies are trying to find methods that allow a consistent and rational management of existing bridges. In this paper, a novel approach is presented. This approach uses multi-objective probabilistic optimization over time and defines performance of existing bridges in terms of lifetime condition, safety, and cost. The proposed approach aims at providing a tool for optimal maintenance management policy definition of a large group of similar structures. Consequently, emphasis is put on the use of limited information and low computational cost. Applications to real cases are presented showing the applicability of the method as well as its advantages in terms of reduction of costs and improvements in performance. | eng |
dc.description.sponsorship | (undefined) | por |
dc.language.iso | eng | eng |
dc.publisher | Taylor and Francis | eng |
dc.rights | openAccess | eng |
dc.title | Multi-objective probabilistic optimization of bridge lifetime maintenance : novel approach | eng |
dc.type | conferencePaper | eng |
dc.peerreviewed | yes | eng |
sdum.pagination | 10 pags | eng |
sdum.publicationstatus | published | eng |
oaire.citationConferenceDate | 16-19 Jul. 2006 | eng |
sdum.event.location | Porto, Portugal | eng |
sdum.event.title | Third International Conference on Bridge Maintenance, Safety and Management | eng |
sdum.event.type | conference | eng |
oaire.citationStartPage | 539 | por |
oaire.citationEndPage | 541 | por |
sdum.conferencePublication | Proceedings of the 3rd International Conference on Bridge Maintenance, Safety and Management - Bridge Maintenance, Safety, Management, Life-Cycle Performance and Cost | por |
Aparece nas coleções: | CEC-EST - Comunicações a Conferências Internacionais |
Ficheiros deste registo:
Ficheiro | Descrição | Tamanho | Formato | |
---|---|---|---|---|
PC 14-Multi-objective probabilistic optimization of bridge.pdf | artigo | 779,89 kB | Adobe PDF | Ver/Abrir |