Utilize este identificador para referenciar este registo: https://hdl.handle.net/1822/56083

Registo completo
Campo DCValorIdioma
dc.contributor.authorCouto, J. Pedropor
dc.contributor.authorCamões, Airespor
dc.contributor.authorTender, M.por
dc.date.accessioned2018-09-28T16:27:10Z-
dc.date.issued2018-06-
dc.date.submitted2018-09-
dc.identifier.citationCouto J. P., Camões A., Tender M. Risk Evaluation in Tunneling Excavation Methods, REM, International Engineering Journal, Vol. 71, Issue jul/sep. 2018, pp. 361-369, doi:10.1590/0370-44672017710115, 2018por
dc.identifier.issn2448-167Xpor
dc.identifier.urihttps://hdl.handle.net/1822/56083-
dc.description.abstractRisk management is of paramount importance for the success of tunneling works and it is linked to the main excavation methods used: the Conventional Excavation Method (CEM) and the Tunnel Boring Machine Method (TBM). Considering the importance of the ?Safety and Health? criterion for the choice of the excavation method, the fact that this criterion is usually mostly focused on the structural component, and taking in account that there is no research showing the advantages of one of the methods over the other, this research intends to conduct a comparative risk analysis between both methods, taking into consideration the different constraints that might appear. In order for this comparison to hold true, a risk evaluation is presented, analysing 12 risks and 4 risk factors in 3 phases, so that the impact of the different variables can really be appraised. This research is made in a scenario of the construction of a 3.5 km-long tunnel in a non-urban area, with an unproblematic rock mass. The final result will be a detailed analysis of the influence of ?Safety and Health? criteria, useful for both the technical and the scientific community, something that has never been done before.por
dc.description.sponsorship(undefined)por
dc.language.isoengpor
dc.publisherFundação Gorceixpor
dc.rightsrestrictedAccesspor
dc.subjectCEMpor
dc.subjecthealth and safetypor
dc.subjectpreventionpor
dc.subjectRiskspor
dc.subjectTBMpor
dc.titleRisk evaluation in tunneling excavation methodspor
dc.typearticle-
dc.peerreviewedyespor
dc.relation.publisherversionhttp://www.scielo.br/scielo.php?pid=S2448-167X2018000300361&script=sci_abstract&tlng=enpor
dc.commentshttp://ctac.uminho.pt/node/2855por
oaire.citationStartPage361por
oaire.citationEndPage369por
oaire.citationIssuejul/sep. 2018por
oaire.citationTitleREM, International Engineering Journal-
oaire.citationVolume71por
dc.date.updated2018-09-28T08:38:57Z-
dc.identifier.doi10.1590/0370-44672017710115por
dc.subject.fosEngenharia e Tecnologia::Engenharia Civilpor
dc.description.publicationversioninfo:eu-repo/semantics/publishedVersionpor
sdum.journalREM: International Engineering Journalpor
Aparece nas coleções:C-TAC - Artigos em Revistas Internacionais

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
2855-2448-167X-remi-71-03-0361.pdf
Acesso restrito!
1,13 MBAdobe PDFVer/Abrir

Partilhe no FacebookPartilhe no TwitterPartilhe no DeliciousPartilhe no LinkedInPartilhe no DiggAdicionar ao Google BookmarksPartilhe no MySpacePartilhe no Orkut
Exporte no formato BibTex mendeley Exporte no formato Endnote Adicione ao seu ORCID