Utilize este identificador para referenciar este registo: https://hdl.handle.net/1822/50648

TítuloAnálise de riscos associados aos principais métodos de escavação subterrânea
Outro(s) título(s)Risk analysis in the main methods of tunnelling
Autor(es)Tender, M.
Couto, J. Pedro
Palavras-chaveCEM
Prevention
Risks
TBM
Tunnels
DataOut-2017
CitaçãoTender M., Couto J. P. Risk analysis in the main methods of tunnelling, Vertentes e Desafios de Segurança 2017, pp. 75-80, 978-989-20-7943-1, 2017
Resumo(s)Risk management is of paramount importance for the success of tunnelling works and it is linked to the main excavation methods used: the Conventional Excavation Method (CEM) and the Tunnelling Boring Machine Method (TBM Method). Considering that there is no research showing univocally the advantages of one of the methods over the other, this work intends to conduct a comparative risk analysis between both methods. In order for this comparison to be as complete as possible, we present a risk evaluation analysing 11 risks and 4 risk factors. The end result will be a complete analysis of the existent risks, useful both for the technical and scientific community, something that has never been done before.
TipoArtigo em ata de conferência
URIhttps://hdl.handle.net/1822/50648
ISBN978-989-20-7943-1
Versão da editorahttp://www.vdseg.pt/
Arbitragem científicayes
AcessoAcesso restrito UMinho
Aparece nas coleções:C-TAC - Comunicações a Conferências Nacionais

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
2795-Artigo VDS INQ publicado.pdf
Acesso restrito!
1,06 MBAdobe PDFVer/Abrir

Partilhe no FacebookPartilhe no TwitterPartilhe no DeliciousPartilhe no LinkedInPartilhe no DiggAdicionar ao Google BookmarksPartilhe no MySpacePartilhe no Orkut
Exporte no formato BibTex mendeley Exporte no formato Endnote Adicione ao seu ORCID