Utilize este identificador para referenciar este registo: https://hdl.handle.net/1822/28524

Registo completo
Campo DCValorIdioma
dc.contributor.advisorCarvalho, Maria Sameiro-
dc.contributor.advisorAlves, Anabela Carvalho-
dc.contributor.authorGonçalves, Carlos Duarte Ribeiro-
dc.date.accessioned2014-03-25T14:56:18Z-
dc.date.available2014-03-25T14:56:18Z-
dc.date.issued2013-
dc.date.submitted2013-
dc.identifier.urihttps://hdl.handle.net/1822/28524-
dc.descriptionDissertação de mestrado integrado em Engenharia e Gestão Industrialpor
dc.description.abstractA presente dissertação do Mestrado Integrado em Engenharia e Gestão Industrial descreve um projeto em ambiente empresarial realizado na empresa General Electric Power Controls Portugal. O objetivo passava por implementar melhorias no atual armazém de materiais e, no abastecimento da área de produção dos disjuntores. Para a elaboração desta dissertação, foi realizada uma revisão bibliográfica sobre logística, gestão de armazéns e operações de armazenagem, onde se abordou a importância que representam para o bom funcionamento das empresas. Para além disso, foi também elaborada uma revisão sobre o Lean Production, na qual se abordou a sua história, o seu conceito, as principais ferramentas e, ainda os benefícios da sua implementação para as organizações. Depois de concluída a fase da revisão bibliográfica, foi apresentada a empresa alvo de estudo e, foi aplicada a metodologia Action-Research com o objetivo de realizar uma análise detalhada à situação atual da empresa, na qual o autor interagiu desde os engenheiros que constituíam os departamentos envolvidos até aos operadores que realizavam as tarefas alvo de estudo com o objetivo de diagnosticar problemas, procurar soluções e implementação das mesmas. Com base nesta análise, foi possível identificar os principais problemas nas áreas alvo de estudo, das quais é possível destacar o desperdício de movimentações, perdas de tempo, excesso de stocks e inexistente gestão visual. Com o objetivo de solucionar estes problemas, foram implementadas técnicas e ferramentas de Lean Production, assim como, ferramentas criadas pelo autor. A aplicação destas medidas, surtiu o efeito desejado, na medida em que foi possível obter diminuição de desperdícios com movimentações, níveis de stock, erros de abastecimento e tempo de espera. As propostas mais significativas foram a implementação de gestão visual em toda a área de produção de disjuntores bem como na área de armazém de materiais e, a alteração da disposição dos materiais em armazém. A gestão visual teve um excelente resultado no que a normalização de abastecimento diz respeito e, a alteração da disposição dos materiais traduziu-se em ganho de espaço e simplicidade de processos no armazém.por
dc.description.abstractThe present dissertation of Master Integrated in Industrial Engineering and Management describes a project in business environment developed in the company General Electric Power Controls Portugal. The target was the implementation of improvements on the actual warehouse of materials and in the supply of circuit breakers production area. To achieve this goal, a literature review was made about logistics, warehouse management and storage operations where it was discussed the influence that they represent for companies. Furthermore, was also made a literature review about Lean Production where was referred the origins, the definition, principal tools and the benefits of the implementation for organizations. After the literature review, was presented the company and applied the methodology Action-Research with the target of describe the actual situation of company where the author interacted with the engineers of involved departments and with operators of the studied tasks. Based on this analysis was possible to identify the principal problems in the studied areas, where is possible to highlight the waste of motions, waste of time, excess of stock levels and the missing of visual management. To find a solution for all problems were implemented skills and tools based on Lean Production and tools designed by the author. The implementation of this actions meant improvements according to the diminution of motion waste, stock levels, wrong supply and time of wait. The most significant proposals were the implementation of visual management in all production area and the new disposition of materials in warehouse. The visual management had an excellent result related to the standardization of supply and new disposition of materials resulted in gain of space and simplicity of processes.por
dc.language.isoporpor
dc.rightsopenAccesspor
dc.subjectAbastecimentopor
dc.subjectGestão de armazémpor
dc.subjectLogísticapor
dc.subjectLean productionpor
dc.subjectSupplypor
dc.subjectWarehouse managementpor
dc.subjectLogisticspor
dc.titleRacionalização da cadeia logística interna de uma empresa de componentes elétricospor
dc.typemasterThesis-
dc.subject.udc658.7-
dc.identifier.tid201188570por
Aparece nas coleções:BUM - Dissertações de Mestrado
DPS - Dissertações de Mestrado

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
Dissertacao_MIEGI_Carlos_Goncalves_2013.pdf8,85 MBAdobe PDFVer/Abrir

Partilhe no FacebookPartilhe no TwitterPartilhe no DeliciousPartilhe no LinkedInPartilhe no DiggAdicionar ao Google BookmarksPartilhe no MySpacePartilhe no Orkut
Exporte no formato BibTex mendeley Exporte no formato Endnote Adicione ao seu ORCID