Utilize este identificador para referenciar este registo: https://hdl.handle.net/1822/12064

Registo completo
Campo DCValorIdioma
dc.contributor.authorPimentel, Carina-
dc.contributor.authorAlvelos, Filipe Pereira e-
dc.contributor.authorDuarte, António Jorge da Silva Trindade-
dc.contributor.authorCarvalho, J. M. Valério de-
dc.date.accessioned2011-04-05T13:08:44Z-
dc.date.available2011-04-05T13:08:44Z-
dc.date.issued2011-
dc.identifier.citation"International Journal of Manufacturing Technology and Management." ISSN 1368-2148. 22:1 (2011) 39-57.por
dc.identifier.issn1368-2148por
dc.identifier.issn1741-5195por
dc.identifier.urihttps://hdl.handle.net/1822/12064-
dc.description.abstractIn this paper, we address a lot splitting and scheduling problem existent in a textile factory. The factory we study produces a set of products that are made of, or assembled from, a list of components. During production, each component can be split into one or several lots of different sizes and each lot will be produced independently on one of a group of identical parallel machines. We formulate the problem into a mixed integer programming model and develop a heuristic method to solve the model. The heuristic method is based on a network flow model with the objective to minimise the weighted sum of the total tardiness of products and the deviations occurred during production of each product. The deviation of a product is measured by the deviation of product completion time (the last component lot completion time) and completion time of the rest of components lots for the same product. We present computational results and performance measures of the network flow heuristic for a set of randomly generated instances based on real world data.por
dc.description.sponsorship(undefined)por
dc.language.isoengpor
dc.relationinfo:eu-repo/grantAgreement/FCT/SFRH/SFRH%2FBD%2F38582%2F2007/PT-
dc.rightsopenAccesspor
dc.subjectLot splittingpor
dc.subjectSchedulingpor
dc.subjectMixed integer programmingpor
dc.subjectMIPpor
dc.subjectNetwork flowspor
dc.subjectIdentical parallel machinespor
dc.subjectTextile industrypor
dc.subjectLot splitting and schedulingpor
dc.titleExact and heuristic approaches for lot splitting and scheduling on identical parallel machinespor
dc.typearticle-
dc.peerreviewedyespor
dc.relation.publisherversionhttp://www.inderscience.compor
oaire.citationStartPage39por
oaire.citationEndPage57por
oaire.citationIssue1por
oaire.citationTitleInternational Journal of Manufacturing Technology and Managementpor
oaire.citationVolume22por
dc.identifier.doi10.1504/IJMTM.2011.038482por
sdum.journalInternational Journal of Manufacturing Technology and Managementpor
Aparece nas coleções:LES/ALG - Artigos em revistas científicas internacionais com arbitragem

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
IJMTM220103 PIMENTEL.pdfPaper on "Lot splitting and scheduling"299,3 kBAdobe PDFVer/Abrir

Partilhe no FacebookPartilhe no TwitterPartilhe no DeliciousPartilhe no LinkedInPartilhe no DiggAdicionar ao Google BookmarksPartilhe no MySpacePartilhe no Orkut
Exporte no formato BibTex mendeley Exporte no formato Endnote Adicione ao seu ORCID