Utilize este identificador para referenciar este registo: https://hdl.handle.net/1822/76741

TítuloLife cycle analysis of a steel railway bridge over the operational period considering different maintenance scenarios: application to a case study
Autor(es)Fernandes, João Nuno Duarte
Matos, José C.
Sousa, Hélder S.
Coelho, Mário Rui Freitas
Palavras-chaveLife cycle analysis
Steel railway bridge
Data11-Mar-2022
EditoraHindawi Publishing Corporation
RevistaAdvances in Civil Engineering
CitaçãoJoão N. D. Fernandes, José C. Matos, Hélder S. Sousa, Mário R. F. Coelho, "Life Cycle Analysis of a Steel Railway Bridge over the Operational Period considering Different Maintenance Scenarios: Application to a Case Study", Advances in Civil Engineering, vol. 2022, Article ID 3010001, 18 pages, 2022. https://doi.org/10.1155/2022/3010001
Resumo(s)In the context of bridge management, three main types of maintenance actions can be considered. Maintenance actions can be taken preventively before the predefined limit condition is reached, or as a corrective measure in case those limits have been reached. The third possibility corresponds to the so-called “doing nothing” scenario, in which no action is taken on the bridge. To be able to implement preventive maintenance, it is necessary to know the current condition of the bridge, as well as to be able to predict its performance. On the other hand, it is also important to be able to identify potentially threatening events that might occur in the analysis life period. This paper describes an integrated methodology to help bridge managers in defining an efficient maintenance program, considering the specific case of a railway bridge. The novelty of the methodology is focused on updating an existing methodology proposed by COST TU1406, by extending it to railway bridges and also by including the resilience analysis in case of a sudden event occurrence. The analysis considers a multi-hazard future scenario, in which a flood event occurs while corrosion phenomena were already in place. The results show the feasibility of the proposed methodology as a support for the establishment of an efficient maintenance schedule to prevent bridge severe degradation, as well as to establish recovery plans in case of a sudden event.
TipoArtigo
URIhttps://hdl.handle.net/1822/76741
DOI10.1155/2022/3010001
ISSN1687-8086
e-ISSN1687-8094
Versão da editorahttps://www.hindawi.com/journals/ace/contents/
Arbitragem científicano
AcessoAcesso aberto
Aparece nas coleções:ISISE - Artigos em Revistas Internacionais

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
3010001.pdfLife Cycle Analysis of a Steel Railway Bridge over the Operational Period considering Different Maintenance Scenarios: Application to a Case Study2,64 MBAdobe PDFVer/Abrir

Partilhe no FacebookPartilhe no TwitterPartilhe no DeliciousPartilhe no LinkedInPartilhe no DiggAdicionar ao Google BookmarksPartilhe no MySpacePartilhe no Orkut
Exporte no formato BibTex mendeley Exporte no formato Endnote Adicione ao seu ORCID