Utilize este identificador para referenciar este registo:
https://hdl.handle.net/1822/70753
Registo completo
Campo DC | Valor | Idioma |
---|---|---|
dc.contributor.author | Dranka, Geremi Gilson | por |
dc.contributor.author | Ferreira, Paula Varandas | por |
dc.date.accessioned | 2021-03-12T09:41:42Z | - |
dc.date.available | 2021-03-12T09:41:42Z | - |
dc.date.issued | 2018 | - |
dc.identifier.issn | 0360-5442 | - |
dc.identifier.uri | https://hdl.handle.net/1822/70753 | - |
dc.description.abstract | The Brazilian electricity system is an important example of a large country relying on a high renewable energy matrix with a major focus on hydropower, which has historically allowed for low carbon electricity production. However, the increase in the demand and climate change impacts on the availability of these renewable resources represent important challenges for long-term power planning. The contribution of this paper is twofold: Firstly, a first attempt to use the EnergyPLAN model for the analysis of the Brazilian electricity sector and in particular to study future scenarios is presented. Secondly, the possibility of achieving a 100% RES system is also addressed. The 100% RES scenario is found to be theoretically possible but a substantial increase in the overall installed capacity would be required, to support the grid mainly during the spring and summer season. The results underline the importance of seasonal complementarity of hydro and wind power and reveal how an increase in RES would add exportation potential, reducing also the Brazilian external energy dependency. The study identifies risk factors for these high RES scenarios and outlines several avenues for future research to address cost, environmental and technical uncertainties of the system. | por |
dc.description.sponsorship | - The authors wish to acknowledge the support of ALGORITMI research Centre at University of Minho. This work has been supported by COMPETE: POCI-01-0145-FEDER-007043 and FCT - Fundacao para a Ciencia e Tecnologia within the Project Scope: UID/CEC/00319/2013. | por |
dc.language.iso | eng | por |
dc.publisher | Elsevier 1 | por |
dc.relation | POCI-01-0145-FEDER-007043 | por |
dc.relation | info:eu-repo/grantAgreement/FCT/5876/147280/PT | por |
dc.rights | openAccess | por |
dc.subject | Brazilian electricity sector | por |
dc.subject | Energy system analysis | por |
dc.subject | EnergyPLAN | por |
dc.subject | Renewable energy | por |
dc.title | Planning for a renewable future in the Brazilian power system | por |
dc.type | article | por |
dc.peerreviewed | yes | por |
dc.relation.publisherversion | https://www.sciencedirect.com/science/article/pii/S0360544218317006 | por |
oaire.citationStartPage | 496 | por |
oaire.citationEndPage | 511 | por |
oaire.citationVolume | 164 | por |
dc.date.updated | 2021-03-11T15:56:41Z | - |
dc.identifier.doi | 10.1016/j.energy.2018.08.164 | por |
dc.subject.wos | Science & Technology | - |
sdum.export.identifier | 9074 | - |
sdum.journal | Energy | por |
Aparece nas coleções: | CAlg - Artigos em revistas internacionais / Papers in international journals |
Ficheiros deste registo:
Ficheiro | Descrição | Tamanho | Formato | |
---|---|---|---|---|
3.0 Artigo_EnergyPLAN_Review_Stage_v2.pdf | 485,92 kB | Adobe PDF | Ver/Abrir |