Utilize este identificador para referenciar este registo:
https://hdl.handle.net/1822/62988
Título: | BIM as a tool for setting and infrastructure management |
Autor(es): | Cruz, Paulo J. S. Azenha, Miguel Mateus, Ricardo Magalhães, Tais Granja, José Luís Duarte Lobão, Ricardo Jorge Alves Silvestre |
Palavras-chave: | BIM-FM Case study University of Minho |
Data: | Abr-2019 |
Editora: | University College Cork |
Citação: | Cruz P. J. S., Azenha M., Mateus R., Magalhães T., Granja J., Lobão R. BIM as a tool for setting and infrastructure management, The 5th International Workshop on UI GreenMetric World University Rankings (IWGM 2019). Sustainable University in a Changin World: Lessons, Challenges and Opportunities., pp. 1-7, 2019 |
Resumo(s): | Based on the consistent background and knowledge that the University of Minho (UMinho) has in ?Building Information Modelling?, a practical roadmap towards the full BIM digitalization of the infrastructure management process has been recently set-up. After an initial diagnosis stage, the process of BIM implementation formally involves four stages related to the definition of modelling rules/requisites (Stage 1), the preparation of prototype buildings to test the concepts (Stage 2), the enlargement/ generalization of the process towards the Campuses of the UMinho (Stage 3) and a final stage of consolidation and improvements (Stage 4). This paper briefly describes the implementation of the two first steps, with a particular emphasis to the description of the two selected case studies. |
Tipo: | Artigo em ata de conferência |
URI: | https://hdl.handle.net/1822/62988 |
ISBN: | 978-979-456-799-9 |
Arbitragem científica: | yes |
Acesso: | Acesso aberto |
Aparece nas coleções: | C-TAC - Comunicações a Conferências Internacionais EAAD - Comunicações Lab2PT - Comunicações Lab2PT - Comunicações |
Ficheiros deste registo:
Ficheiro | Descrição | Tamanho | Formato | |
---|---|---|---|---|
3043-PCruz_MAzenha_RMateus_et_al.pdf | 2,81 MB | Adobe PDF | Ver/Abrir |