Utilize este identificador para referenciar este registo: https://hdl.handle.net/1822/42809

TítuloProblem of hydroelectric resources management: numerical approach
Autor(es)Bushenkov, V. A.
Ferreira, M. Margarida A.
Ribeiro, Ana Filipa
Smirnov, Georgi
Palavras-chaveOptimal control
Global optimization
Projection estimation refinement method
Projection estimation refnement method
Data2016
EditoraNatural Sciences Publishing
RevistaApplied Mathematics and Information Sciences
Resumo(s)In this work we analyze an optimal control problem for a system of two hydroelectric power stations in cascade with reversible turbines. The objective is to optimize the profit of power production while respecting the system’s restrictions. Some of these restrictions translate into state constraints and the cost function is nonconvex. This increases the complexity of the optimal control problem. The problem is solved numerically and two different approaches are adopted. These approaches focus on global optimization techniques (Chen-Burer algorithm) and on a projection estimation refinement method (PER method). PER method is used as a technique to reduce the dimension of the problem. Results and execution time of the two procedures are compared.
TipoArtigo
URIhttps://hdl.handle.net/1822/42809
DOI10.18576/amis/100302
ISSN1935-0090
e-ISSN2325-0399
Versão da editorahttp://www.naturalspublishing.com/Article.asp?ArtcID=11503
Arbitragem científicayes
AcessoAcesso restrito UMinho
Aparece nas coleções:DMA - Artigos (Papers)

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
AMISBushenkovFerreiraRebeloSmirnov.pdf
Acesso restrito!
479,59 kBAdobe PDFVer/Abrir

Partilhe no FacebookPartilhe no TwitterPartilhe no DeliciousPartilhe no LinkedInPartilhe no DiggAdicionar ao Google BookmarksPartilhe no MySpacePartilhe no Orkut
Exporte no formato BibTex mendeley Exporte no formato Endnote Adicione ao seu ORCID