Data | Título | Autor(es) | Tipo | Acesso |
7-Set-2006 | Distributed production planning and control agent based system | Lima, Rui M.; Sousa, Rui M.; Martins, Paulo Jorge de Figueiredo | Artigo | Acesso aberto |
2020 | Industry 4.0 triggered by Lean Thinking: insights from a systematic literature review | Bittencourt, V. L.; Alves, Anabela Carvalho; Leão, Celina Pinto | Artigo | Acesso restrito UMinho |
2016 | ISO 9001 certification in the American Continent: a statistical analysis and modelling | Salgado, Eduardo Gomes; Beijo, Luiz Alberto; Sampaio, Paulo, et al. | Artigo | Acesso restrito autor |
2022 | Modelling and control of manufacturing systems subject to context recognition and switching | Southier, Luiz Fernando Puttow; Casanova, Dalcimar; Barbosa, L. S., et al. | Artigo | Acesso aberto |
15-Abr-2011 | Order release in a workload controlled flow-shop with sequence-dependent set-up times | Fernandes, Nuno Octávio Garcia; Silva, Sílvio Carmo | Artigo | Acesso aberto |
2013 | Using AHP and the IPMA competence baseline in the project managers selection process | Varajão, João; Cunha, Maria Manuela Cruz | Artigo | Acesso aberto |