dc.descriptionDissertação de mestrado integrado em Engenharia Civilpor
dc.description.abstractO BIM está cada vez mais presente nas diversas fases do ciclo de vida das construções. De entre os diversos envolvidos nesta atividade, os construtores são dos que poderão tirar maior partido das potencialidades inerentes à adoção sistemática e regular desta metodologia inovadora. As pontes têm especificidades, quer em fase de projeto, quer na preparação e no planeamento da sua construção, que têm retardado a completa aplicação do conceito e da metodologia BIM a este tipo de estruturas. Mesmo assim, as técnicas BIM começam a disseminar-se de forma alargada no contexto do projeto e construção de pontes, e com uma pertinência e especificidade tais que até levou ao surgimento da designação própria de Bridge Information Modelling (BrIM). Neste trabalho descreve-se a aplicação prática ao caso de estudo da construção da nova ponte sobre o Rio Dão, cujo construtor é a empresa CASAIS, S.A., em que se procurou implementar a metodologia BrIM em paralelo com a metodologia tradicional, quer para a preparação da obra, quer para o seu planeamento. Foi também dado enfoque às limitações das plataformas/ferramentas adotadas, bem como uma perspetiva acerca das dificuldades de implementação no contexto do processo produtivo, nomeadamente tendo em conta que este é, atualmente, realizado por profissionais mais acostumados aos procedimentos tradicionais. Com esta aplicação piloto, procuraram-se obter conclusões acerca desta implementação específica, com especial ênfase para as vantagens que podem ser colhidas ao adotar abordagens BIM neste tipo de construções e na divulgação de novas formas de tratar e analisar a informação gerada.por
dc.description.abstractBIM is more and more present on all the phases of buildings life cycle. Among all the people involved in this activity, builders are the ones who can take greater advantage of the potentialities inherent to the regular and systematic adoption of this innovative methodology. Bridges have particularities, either in project phase or in construction preparation and planning, which have delayed the application of BIM concept and methodology to this type of structures. Notwithstanding, BIM techniques begin to spread so wide in the context of bridges design and construction, and with such a relevance and specificity that led to the emergence of its own designation of Bridge Information Modelling (BrIM). This work describes a practical application on a case study about the construction of a new bridge over Dão river, whose constructor is the contractor CASAIS, S.A., in which it sought to implement the BrIM methodology in parallel with the traditional one either for the preparation of the work as for its planning. It was also given emphasis to the limitations of the platforms/tools adopted, as well to the perspective about the difficulties of implementation in the context of the productive process, in particular bearing in mind that this is currently held by professionals more accustomed to traditional procedures. With this pilot application, sought to obtain conclusions about this specific implementation, with special emphasis on the advantages that can be harvested by adopting BIM approaches in this type of constructions and on dissemination of new ways to treat and assess the information generated.por
dc.language.isoporpor
dc.rightsopenAccesspor
dc.subjectBuilding information modelling (BIM)por
dc.subjectBridge information modelling (BrIM)por
dc.subjectModelação geométrica e de armaduras (BIM 3D)por
dc.subjectPlaneamento da construção (BIM 4D)por
dc.subjectGeometric and steel rebar modelling (BIM 3D)por
dc.subjectConstruction planning (BIM 4D)por
dc.titleAplicação de metodologias BIM no contexto da construção da nova ponte sobre o Rio Dãopor
dc.title.alternativeApplication of BIM methodologies for the construction of the new bridge over the Dão Riverpor
dc.typemasterThesis-
sdum.uoeiEscola de Engenhariapor
dc.subject.fosEngenharia e Tecnologia::Engenharia Civilpor
Appears in Collections:BUM - Dissertações de Mestrado Integrado
ISISE - Dissertações de Mestrado

Files in This Item:
File Description SizeFormat 
Dissertação Bruno Ribeiro.pdf15,3 MBAdobe PDFView/Open

Partilhe no FacebookPartilhe no TwitterPartilhe no DeliciousPartilhe no LinkedInPartilhe no DiggAdicionar ao Google BookmarksPartilhe no MySpacePartilhe no Orkut
Exporte no formato BibTex mendeley Exporte no formato Endnote Adicione ao seu ORCID