TitleProject management: multiple resources allocation
Author(s)Tereso, Anabela Pereira
Araújo, Maria Madalena Teixeira de
Moutinho, Rui
Elmaghraby, Salah
KeywordsProject management and scheduling
Stochastic activity networks
Resource allocation
Dynamic programming
Electromagnetic algorithm
Evolutionary algorithm
Issue dateJun-2008
PublisherEditora E-papers
CitationHERSKOVITS, J. [et al.], eds. – “EngOpt 2008 : International Conference on Engineering Optimization, Rio de Janeiro, 2008.” [S.l. : E-Papers, 2008]. ISBN 978-85-7650-156-5.
Abstract(s)Given a project network under stochastic conditions, the goal is to determine the optimal resource allocation to the activities in order to minimize the total project cost. This cost includes the resource cost and the tardiness cost. In this work we consider the multiple resources case, which is an extension of the models previously developed by the rst author and other researchers, considering a single resource. We assume that all the resources are independent and abundant. The work consists mainly of two parts: formalization of the new models, and their implementation in Java. In order to formalize the models, it was necessary to establish an allocation strategy for the multiple resources. This is required to ensure the desired equality of expected durations yielded by each resource in the same activity. We study four di erent allocation strategies: two of them are derived from the stochastic nature of the work content by equalizing the expected durations, thus determining the allocation vectors; and the other two go down to the level of all possible values to devise an allocation method (among all the allocation vectors, selects those leading to equal expected durations). Then the probability distributions of the variables required for analysis and evaluation were determined. Although the research has covered four strategies, one proved to be inferior compared to the others, and another was too complex to be easily implemented. The remaining two are strong rivals with neither dominating the other, and one of them was arbitrarily chosen for implementation. The implementation covers three algorithms: Dynamic Programming Algorithm, Electromagnetic Algorithm and Evolutionary Algorithm. Concurrent programming was exploited to enhance performance. We report on the performance of our application over a representative set of project networks.
TypeConference paper
URIhttp://hdl.handle.net/1822/8632
ISBN978-85-7650-156-5
Peer-Reviewedyes
AccessOpen access
Appears in Collections:CGIT - Publicações em actas de encontros científicos / Papers in conference proceedings
CESP - Textos Completos em Actas de Encontros Científicos Internacionais com Arbitragem

Files in This Item:
File Description SizeFormat 
pm-mra-engopt2008.pdf213,55 kBAdobe PDFView/Open

Partilhe no FacebookPartilhe no TwitterPartilhe no DeliciousPartilhe no LinkedInPartilhe no DiggAdicionar ao Google BookmarksPartilhe no MySpacePartilhe no Orkut
Exporte no formato BibTex mendeley Exporte no formato Endnote Adicione ao seu ORCID