Utilize este identificador para referenciar este registo: https://hdl.handle.net/1822/66679

TítuloInteger programming model for ship loading management: a case study from cement industry
Autor(es)Fonseca, João
Alves, Ricardo
Macedo, Ana Regina
Oliveira, José A.
Pereira, Guilherme
Carvalho, Maria Sameiro
Palavras-chaveCement industry
Logistics optimization
Operations research
Repositioning model
Storage yard management
Data2019
EditoraSpringer Verlag
RevistaLecture Notes in Electrical Engineering
Resumo(s)Industries only survive in the modern business world if they are prepared to improve processes whenever it is necessary. Therefore, companies need to adapt and/or modify processes to improve the level of service and reduce needless costs. In this article the logistics problem of planning a ship load operation of a Portuguese cement company is addressed. The objective is to determine the best way to transport the bagged cement from the warehouse to a ship reducing costs and optimizing forklifts operations. A mathematical programming model is proposed showing this methodology as a powerful tool to provide effective support to a more intelligent decision process.
TipoArtigo em ata de conferência
URIhttps://hdl.handle.net/1822/66679
ISBN9783319913339
DOI10.1007/978-3-319-91334-6_101
ISSN1876-1100
Arbitragem científicayes
AcessoAcesso aberto
Aparece nas coleções:CAlg - Artigos em livros de atas/Papers in proceedings

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
artigo_helix_2018.pdf123,03 kBAdobe PDFVer/Abrir

Partilhe no FacebookPartilhe no TwitterPartilhe no DeliciousPartilhe no LinkedInPartilhe no DiggAdicionar ao Google BookmarksPartilhe no MySpacePartilhe no Orkut
Exporte no formato BibTex mendeley Exporte no formato Endnote Adicione ao seu ORCID