Please use this identifier to cite or link to this item: http://hdl.handle.net/1822/42809

TitleProblem of hydroelectric resources management: numerical approach
Author(s)Bushenkov, V. A.
Ferreira, M. Margarida A.
Ribeiro, Ana Filipa
Smirnov, Georgi
KeywordsOptimal control
Global optimization
Projection estimation refinement method
Projection estimation refnement method
Issue date2016
PublisherNatural Sciences Publishing
JournalApplied Mathematics and Information Sciences
Abstract(s)In this work we analyze an optimal control problem for a system of two hydroelectric power stations in cascade with reversible turbines. The objective is to optimize the profit of power production while respecting the system’s restrictions. Some of these restrictions translate into state constraints and the cost function is nonconvex. This increases the complexity of the optimal control problem. The problem is solved numerically and two different approaches are adopted. These approaches focus on global optimization techniques (Chen-Burer algorithm) and on a projection estimation refinement method (PER method). PER method is used as a technique to reduce the dimension of the problem. Results and execution time of the two procedures are compared.
TypeArticle
URIhttp://hdl.handle.net/1822/42809
DOI10.18576/amis/100302
ISSN1935-0090
2325-0399
Publisher versionhttp://www.naturalspublishing.com/Article.asp?ArtcID=11503
Peer-Reviewedyes
AccessRestricted access (UMinho)
Appears in Collections:DMA - Artigos (Papers)

Files in This Item:
File Description SizeFormat 
AMISBushenkovFerreiraRebeloSmirnov.pdf
  Restricted access
479,59 kBAdobe PDFView/Open

Partilhe no FacebookPartilhe no TwitterPartilhe no DeliciousPartilhe no LinkedInPartilhe no DiggAdicionar ao Google BookmarksPartilhe no MySpacePartilhe no Orkut
Exporte no formato BibTex mendeley Exporte no formato Endnote Adicione ao seu ORCID