Utilize este identificador para referenciar este registo: https://hdl.handle.net/1822/19358

Registo completo
Campo DCValorIdioma
dc.contributor.authorSantos, Mónica A.-
dc.contributor.authorTereso, Anabela Pereira-
dc.date.accessioned2012-05-17T09:34:20Z-
dc.date.available2012-05-17T09:34:20Z-
dc.date.issued2010-
dc.identifier.urihttps://hdl.handle.net/1822/19358-
dc.description.abstractIn this paper we describe an extension of the Resource-Constrained Project Scheduling Problem (RCPSP). A literature review is presented to place our research in its proper context. The problem presented here belongs to the class of the optimization scheduling problems with multi-level (or multi-mode) activities. This means that the activities can be scheduled at different modes, each mode using a different resource level, implying different costs and durations. Each activity must be allocated exactly one unit of each required resource and the resource unit may be used at any of its specified levels. The processing time of an activity is given by the maximum of the durations that would result from a specific allocation of resources. The objective is to find the optimal solution that minimizes the overall project cost, while respecting a delivery date. A penalty is included for tardiness beyond the specified delivery date. We present a formal description of the problem and a mathematical model for it. We also introduce the implementation algorithm for the problem. The implementation was designed using the JAVA language, and the algorithm proposed is based on a branch and bound procedure, using breadth-first search (BFS) project network traversing, among some heuristic rules to filter large subsets of fruitless candidates relative to resource levels combinations.por
dc.description.sponsorshipFundação para a Ciência e a Tecnologia (FCT)por
dc.language.isoengpor
dc.rightsopenAccesspor
dc.subjectProject scheduling problempor
dc.subjectRCPSPpor
dc.subjectActivity networkspor
dc.subjectMulti-levelpor
dc.subjectMulti-modepor
dc.subjectResource allocationpor
dc.titleOn the multi-mode, multi-skill resource constrained project scheduling problem (MRCPSP-MS)por
dc.typeconferencePaper-
dc.peerreviewedyespor
sdum.publicationstatuspublishedpor
oaire.citationConferenceDate06 - 09 Set. 2010por
oaire.citationConferencePlaceLisboa, Portugalpor
oaire.citationTitle2nd International Conference on Engineering Optimization (EngOpt2010)por
sdum.conferencePublication2nd International Conference on Engineering Optimization (EngOpt2010)por
Aparece nas coleções:CGIT - Publicações em actas de encontros científicos / Papers in conference proceedings
CESP - Textos Completos em Actas de Encontros Científicos Internacionais com Arbitragem

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
EngOpt2010_Paper_Santos_Tereso.pdfTexto completo600,55 kBAdobe PDFVer/Abrir
EngOpt2010Poster_AT_MS.pdfPoster1,11 MBAdobe PDFVer/Abrir

Partilhe no FacebookPartilhe no TwitterPartilhe no DeliciousPartilhe no LinkedInPartilhe no DiggAdicionar ao Google BookmarksPartilhe no MySpacePartilhe no Orkut
Exporte no formato BibTex mendeley Exporte no formato Endnote Adicione ao seu ORCID