Please use this identifier to cite or link to this item: http://hdl.handle.net/1822/15894

TitleWorkload control under continuous order release
Author(s)Fernandes, Nuno Octávio Garcia
Silva, Sílvio Carmo
KeywordsWorkload control
Continuous order release
Simulation
Issue dateMay-2011
PublisherElsevier
JournalInternational Journal of Production Economics
Abstract(s)Past research on workload control (WLC) has been essentially focused on discrete order release. This means that release of orders to the shop floor takes places on a periodic basis. Continuous order release has been somehow neglected, in spite of its apparent potential for improving system performance, including the reduction of order flow times. This paper addresses a simulation study of this order release approach. The study contributes for improving the basis for setting workload norms and selecting the workload control strategy under continuous order release. Additionally, it gives insights on the choice of routing alternatives, which facilitate the linkage of continuous order release mechanisms with the specific characteristics of the shop floor.
TypeArticle
URIhttp://hdl.handle.net/1822/15894
DOI10.1016/j.ijpe.2010.09.026
ISSN0925-5273
Publisher versionhttp://www.elsevier.com/wps/find/journaldescription.cws_home/505647/description
Peer-Reviewedyes
AccessOpen access
Appears in Collections:CGIT - Artigos em revistas de circulação internacional com arbitragem científica
CESP - Artigos em revistas científicas internacionais com arbitragem

Files in This Item:
File Description SizeFormat 
WLC Cintinuous OR.pdfPre-print do texto completo do artigo103,52 kBAdobe PDFView/Open

Partilhe no FacebookPartilhe no TwitterPartilhe no DeliciousPartilhe no LinkedInPartilhe no DiggAdicionar ao Google BookmarksPartilhe no MySpacePartilhe no Orkut
Exporte no formato BibTex mendeley Exporte no formato Endnote Adicione ao seu ORCID